Variable Rate Injection Well #2753
Replies: 1 comment
-
It is the right approach. Please check the cases (xml files) from repo to see examples how to use it: |
Beta Was this translation helpful? Give feedback.
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
-
I want to model a supercritical CO2 injection well whose target injection rate is a function of time. The simplest example would be a 50 year total simulation time with injection at a constant rate for the first 20 years, then no injection after that to watch the pressure fall off after injection.
I think I need to add this to my WellControls element:
targetTotalRateTableName="targetTotal RateTable"
and then create a text tile called targetTotalRateTable.txt
Thanks!
Charles Hostetler
SCS Engineers
[email protected]
Beta Was this translation helpful? Give feedback.
All reactions